HomeStrong Engineering Capabilities: Wuhan Shentong (Xiaogan) Distribution Center

Strong Engineering Capabilities: Wuhan Shentong (Xiaogan) Distribution Center

Publish Time: 2025-04-15

It took three months, and 50% of the belt lines (10,000+ meters) and 50% of the steel platforms (10,000+ square meters) of the entire project were installed by our company.



The project installation staff exceeded 100 people at the peak time to ensure the on-time delivery of the Wuhan Shentong project.

×